Яндекс.Метрика

+7 (351) 729-92-93
Головной офис / Headquarters

+7 (495) 644-16-91
+7 (963) 650-73-60
Дилер в Москве / Moscow Dealer

News All news

Spares

   
 
Spares 1 - 15 of 61
First | Prev. | 1 2 3 4 5 | Next | Last All

Photo Description Cost
Half-coupling КB-408.81.00.019

Half-coupling КB-408.81.00.008

Half-coupling КB-408.81.00.001

Slide Pin КB-401.02.00.001

Tie Bar Eye КB-408.21.08.00.004

Part of a tie bar.

Slide Pin KB-408.21.08.00.003

Slide Pin КB-408.21.08.00.001

Axle КB-408.21.04.40.011

Slide Pin KB-403Б.60.40.001

Pin KB-408.21.03.01.002 М 48 х 780

A pin fastens a tower section to the portal. The manufacturing period is 15 days.

Pin KB-408.21.03.00.003 М 36 х 580

A pin fastens a tower section to a diagonal beam. The manufacturing period is 15 days.

Counterweight Pin KB-408.21.02.06.001

Chassis arm КB-403А.01.02.000

The chassis arms are provided in a set of four together with the travelling frame KB-403B0.010.00.000. The manufacturing period is 25 days.

Cantilever Arm KB-408.21.01.02.000, KB-408.21.01.06.000, KB-408.21.01.07.000, KB-408.21.01.08.000

A cantilever arm is pivotally attached to the base support. It is formed in the shape of a box girder with variable cross-section and connects a ring frame with the travelling undercarriage. A working eyelet and a transport eyelet are welded into the top slab of the cantilever arm on the side that is facing the crane travel axis. Working and transport eyelets are used to fix the cantilever arm relatively to the ring frame.

Anchor Bolt KB-401.24.00.000

An anchor bolt (2 pieces) is a 3.5 m long rod with loops and nuts that are threaded on both sides (thread size М48). The bolts hold the tower upright and are inserted through the revolving base plate and each of the two ballast blocks (the left one and the right one) separately, holding them in place.


Spares 1 - 15 of 61
First | Prev. | 1 2 3 4 5 | Next | Last All